
| 8:00 am | Registration |
| 8:30 am | Peat Filter -Design -Performanc in North Carolina -Operation Concerns |
| 10:00 am | Break |
| 10:15 am | Design of Drainage for On-Site Sewage Systems |
| 11:45 am | Lunch and Travel to Site |
| 12:00 | Lunch |
| 1:15 pm | Site and Soil Concerns for Selections of
Peat Filter as the Repair Option Design Consideration for the System Installation Considerations for teh System Performance and Operation of the System Figure Eight Island Recirculating Sand Filter |
| 4:15 pm | Adjourn |
Please address any questions to Dr. David Lindbo, Assistant Professor/Extension Specialist.
This page
(http://www.ces.ncsu.edu/plymouth/septic/98fletcher.html)
created by
Vera MacConnell,
Research Technician, I
on March 11, 1999
Last Updated on June 4, 1999.